The new look for Geneva Airport has been unveiled.
The current building was designed in 1968 and it will be obsolete by 2040 - so a major redesign is needed.
The check-in area will be expanded, security moved to a new building, the train line will be on the surface and the shopping mall will be redeveloped.
Work will start in two years and the first stage will last until 2032.
Geneva could foot the G7 bill
US NGO discovers Swiss child abuse cases
French singer banned by Paleo
Cars going uninspected
War may lead to rent rises
Not a heatwave, yet
